NAVIGATION

Forklift loading ramp/Hydraulic steel grid /HRHS-10T/

Product description:HRHS,10T mobile loading ramp is a special auxiliary equipment for cargo handling. Forklift trucks can be transported directly to the trunk or container for heavy loading and unloading operations. Safe, energy saving and efficient. This type of boarding bridge uses a manual hydraulic pump and two hydraulic cylinders to lift. Greater economic benefits can be achieved by reducing labor costs for businesses, improving work efficiency and accelerating commodity mobility.

Product parameter

Parameters
Name:forklift loading ramps Model: HRHS-10
Length:10.3m Width:2.2m
Operating height: 1.2m-1.68m Tires: 600-9 solid tires
Main anti-slip panel: grille plate Color: Red
Description: Size for reference only, can be customized size, color.
Please consult:

Phone: +86 18138392005              Email:m18138392005@163.com           WhatsApp: +86 18138392005(China)

Product picture

 

Product introduction

1. Use
HRHS,10T mobile loading ramp is a special auxiliary equipment for cargo handling. Forklift trucks can be transported directly to the trunk or container for heavy loading and unloading operations. Safe, energy saving and efficient. This type of boarding bridge uses a manual hydraulic pump and two hydraulic cylinders to lift. Greater economic benefits can be achieved by reducing labor costs for businesses, improving work efficiency and accelerating commodity mobility.
Second, the basic working principle
one Operation before use: Check the hydraulic cylinder, hand pump, load bearing hand leg, connection bolt and live Hank intact. Raise the boarding bridge parallel to the truck, then push the rear of the container truck with forklift, and then relieve the pressure to attach the front board to the rear of the container truck. Then the chain of the boarding bridge is fixed with the container truck, and it can be used;
2. Operation after use: when the goods are loaded, untie the chain, lift the axle, and the truck can leave. In this way, the entire working process is completed.
Third, safety performance description
1, with a safety support leg, safety protection;
2, the bridge surface grid steel plate anti-slip structure design, can strengthen the friction resistance of forklift wheel, safe and reliable;
3, the whole bridge body and container truck link, so that the bridge body to achieve the maximum load, theoretical static load can reach 15 tons, dynamic load up to 10 tons.

Factory qualification

Forklift loading ramp/Hydraulic steel grid /HRHS-10T/